Programmer IV
Apply NowCompany: Advance American Tech, Inc.
Location: Salem, OR 97301
Description:
Programmer IV
Qualifications:
Agency is contracting with Contractor for ITPS in connection with the following project (the "Project"):
The Deliverables completed by contractor under this WOC will be for the OR-Kids Upgrade Project.
In preparation for developing new modular components or using components developed by other states, the existing OR-Kids system and technology must be upgraded to, and be compatible with, current technology standards.
The services delivered by Contractor will perform foundational modernization to OR-Kids to:
Deliverables must document completed enhancements to ensure complete system documentation for OR-Kids.
Contractor shall develop and deliver updates to the OR-Kids system. This includes software code changes and documentation.
Contractor shall participate in sprint planning and review meetings with Authorized Agency's Solution Development & Delivery (SDD) OR-Kids team and provide feedback and advice on the overall work schedule, including identifying and recommending specific segments of work to be completed for the upgrade of the OR-Kids system.
Contractor shall complete and document changes, defect corrections, and code modifications within the scope of this WOC in the appropriate Deliverables (Sprint report packages, code modifications, technical specifications, test plans and test scripts) and Authorized Agency's defect tracking system (JIRA). Contractor shall draft and deliver Technical Specifications documents and participate in daily and weekly planning and review meetings.
Contractor shall write and review the test plans and test scripts and make necessary changes as needed. Contractor shall perform unit testing to ensure requirements are met and changed code works as specified.
Contractor shall follow Authorized Agency's existing requirements management, design, development and issue tracking processes and development standards (including naming conventions) during the course of performance.
Authorized Agency's existing processes use JIRA and similar tools for tracking issues and an Agile Scrum approach is followed for development work.
Contractor shall document in the JIRA tracking system any issues identified in testing and their resolution taken to resolve the issues. Contractor shall conduct end to end system testing as well as end to end system integration testing. This system integration testing will include testing the code changes within the application as well as system interface testing between the OR-Kids system and its interfaces.
Proposals must include:
a. Examples of prior work product relevant to the Services and Deliverables described in this Opportunity (maximum five pages).
b. A summary of Key Person(s) qualifications and experience providing the requested or similar services. If Key Person(s) are the Proposer's sub-contractors, identify the sub-contracting firm and the percentage of work that will be sub-contracted out.
c. A description of your organization's experience of relevant functional business areas of the State of Oregon Child Welfare (CW) programs and processes, or similar knowledge from other states.
d. Resumes of Key Person(s) proposed to perform work as described in this Opportunity, including their education and work experience.
e. Contact information for three (3) Proposer references. References must be clients for whom your organization has performed similar work within the last three (3) years. Where possible, clients listed for reference should be state or local Oregon government agencies or health and human services organizations in other states. Include the client's company name, address, and contact person with telephone and email address for the contact person. The contact person must be someone who was directly involved in the work and is qualified to evaluate Proposer's performance.
f. Contact information for three (3) references for each proposed Key Person. References must be for similar work performed within the last three (3) years. Where possible, clients listed for reference should be state or local Oregon government agencies or health and human services organizations in other states. Include the client's company name, address, and contact person with telephone and email address for the contact person. The contact person must be someone who was directly involved in the work and is qualified to evaluate the performance of the Key Person(s).
g. A detailed Cost Proposal for proposed Deliverables, consistent with the Delivery and Payment Schedule table below in Section I.
h. Availability: Confirm that current workload allows for a start date and completion of this work within stated timeframes.
Please see attached SOW for full details.
Number Name Deliverables Description Start Date End Date 1.01 Sprint Report Package - July 2019
Sprint Report Package - July 2019
Sprint Report Package - July 2019
07/01/2019 07/31/2019 1.02 Sprint Report Package - August 2019
Sprint Report Package - August 2019
Sprint Report Package - August 2019
08/01/2019 08/31/2019 1.03 Sprint Report Package - September 2019
Sprint Report Package - September 2019
Sprint Report Package - September 2019
09/01/2019 09/30/2019 1.04 Sprint Report Package - October 2019
Sprint Report Package - October 2019
Sprint Report Package - October 2019
10/01/2019 10/31/2019 1.05 Sprint Report Package - November 2019
Sprint Report Package - November 2019
Sprint Report Package - November 2019
11/01/2019 11/30/2019 1.06 Sprint Report Package - December 2019
Sprint Report Package - December 2019
Sprint Report Package - December 2019
12/01/2019 12/31/2019 1.07 Sprint Report Package - January 2020
Sprint Report Package - January 2020
Sprint Report Package - January 2020
01/01/2020 01/31/2020 1.08 Sprint Report Package - February 2020
Sprint Report Package - February 2020
Sprint Report Package - February 2020
02/01/2020 02/29/2020 1.09 Sprint Report Package - March 2020
Sprint Report Package - March 2020
Sprint Report Package - March 2020
03/01/2020 03/31/2020 1.1 Sprint Report Package - April 2020
Sprint Report Package - April 2020
Sprint Report Package - April 2020
04/01/2020 04/30/2020 1.11 Sprint Report Package - May 2020
Sprint Report Package - May 2020
Sprint Report Package - May 2020
05/01/2020 05/31/2020 1.12 Sprint Report Package - June 2020
Sprint Report Package - June 2020
Sprint Report Package - June 2020
06/01/2020 06/30/2020 2 2.1
Technical Specifications Documents
Technical Specifications Documents
06/01/2020 06/30/2020 4.1 4.1
Unit test plan
Unit test plan
06/01/2020 06/30/2020 4.2 4.2
Unit test scripts
Unit test scripts
06/01/2020 06/30/2020 Background Verification
Minimum Verification Requirements
Please have the candidate complete the required form upon selection. The form is located on the dashboard.
Qualifications:
- 10+ years of experience with Java 5+, JavaScript , Struts 1+ and M-SQL database
- State implementation experience with any of the SACWIS base systems developed by CGI
- Experience doing similar post-implementation modernization work at a state using a CGI SACWIS transfer system
- Experience using a Subversion software repository
- Experience using Jira for software development documentation
- Experience developing and executing software development test plans
Agency is contracting with Contractor for ITPS in connection with the following project (the "Project"):
The Deliverables completed by contractor under this WOC will be for the OR-Kids Upgrade Project.
In preparation for developing new modular components or using components developed by other states, the existing OR-Kids system and technology must be upgraded to, and be compatible with, current technology standards.
The services delivered by Contractor will perform foundational modernization to OR-Kids to:
- Changes to existing code may involve translating coding to JAVA 11 (from JAVA 7); all new code will be done using JAVA 11. Remove Internet Explorer constraints and enable it to operate seamlessly (without error) with the Chrome browser implementation at DHS planned for October 2019.
- Modify user interface configuration to provide a consistent and high usability web page display to users with minimal use of web page level configuration variables. Move toward global configurations for web page display where possible with a focus on streamlining data entry functions for users.
Deliverables must document completed enhancements to ensure complete system documentation for OR-Kids.
Contractor shall develop and deliver updates to the OR-Kids system. This includes software code changes and documentation.
Contractor shall participate in sprint planning and review meetings with Authorized Agency's Solution Development & Delivery (SDD) OR-Kids team and provide feedback and advice on the overall work schedule, including identifying and recommending specific segments of work to be completed for the upgrade of the OR-Kids system.
Contractor shall complete and document changes, defect corrections, and code modifications within the scope of this WOC in the appropriate Deliverables (Sprint report packages, code modifications, technical specifications, test plans and test scripts) and Authorized Agency's defect tracking system (JIRA). Contractor shall draft and deliver Technical Specifications documents and participate in daily and weekly planning and review meetings.
Contractor shall write and review the test plans and test scripts and make necessary changes as needed. Contractor shall perform unit testing to ensure requirements are met and changed code works as specified.
Contractor shall follow Authorized Agency's existing requirements management, design, development and issue tracking processes and development standards (including naming conventions) during the course of performance.
Authorized Agency's existing processes use JIRA and similar tools for tracking issues and an Agile Scrum approach is followed for development work.
Contractor shall document in the JIRA tracking system any issues identified in testing and their resolution taken to resolve the issues. Contractor shall conduct end to end system testing as well as end to end system integration testing. This system integration testing will include testing the code changes within the application as well as system interface testing between the OR-Kids system and its interfaces.
Proposals must include:
a. Examples of prior work product relevant to the Services and Deliverables described in this Opportunity (maximum five pages).
b. A summary of Key Person(s) qualifications and experience providing the requested or similar services. If Key Person(s) are the Proposer's sub-contractors, identify the sub-contracting firm and the percentage of work that will be sub-contracted out.
c. A description of your organization's experience of relevant functional business areas of the State of Oregon Child Welfare (CW) programs and processes, or similar knowledge from other states.
d. Resumes of Key Person(s) proposed to perform work as described in this Opportunity, including their education and work experience.
e. Contact information for three (3) Proposer references. References must be clients for whom your organization has performed similar work within the last three (3) years. Where possible, clients listed for reference should be state or local Oregon government agencies or health and human services organizations in other states. Include the client's company name, address, and contact person with telephone and email address for the contact person. The contact person must be someone who was directly involved in the work and is qualified to evaluate Proposer's performance.
f. Contact information for three (3) references for each proposed Key Person. References must be for similar work performed within the last three (3) years. Where possible, clients listed for reference should be state or local Oregon government agencies or health and human services organizations in other states. Include the client's company name, address, and contact person with telephone and email address for the contact person. The contact person must be someone who was directly involved in the work and is qualified to evaluate the performance of the Key Person(s).
g. A detailed Cost Proposal for proposed Deliverables, consistent with the Delivery and Payment Schedule table below in Section I.
h. Availability: Confirm that current workload allows for a start date and completion of this work within stated timeframes.
Please see attached SOW for full details.
Number Name Deliverables Description Start Date End Date 1.01 Sprint Report Package - July 2019
Sprint Report Package - July 2019
Sprint Report Package - July 2019
07/01/2019 07/31/2019 1.02 Sprint Report Package - August 2019
Sprint Report Package - August 2019
Sprint Report Package - August 2019
08/01/2019 08/31/2019 1.03 Sprint Report Package - September 2019
Sprint Report Package - September 2019
Sprint Report Package - September 2019
09/01/2019 09/30/2019 1.04 Sprint Report Package - October 2019
Sprint Report Package - October 2019
Sprint Report Package - October 2019
10/01/2019 10/31/2019 1.05 Sprint Report Package - November 2019
Sprint Report Package - November 2019
Sprint Report Package - November 2019
11/01/2019 11/30/2019 1.06 Sprint Report Package - December 2019
Sprint Report Package - December 2019
Sprint Report Package - December 2019
12/01/2019 12/31/2019 1.07 Sprint Report Package - January 2020
Sprint Report Package - January 2020
Sprint Report Package - January 2020
01/01/2020 01/31/2020 1.08 Sprint Report Package - February 2020
Sprint Report Package - February 2020
Sprint Report Package - February 2020
02/01/2020 02/29/2020 1.09 Sprint Report Package - March 2020
Sprint Report Package - March 2020
Sprint Report Package - March 2020
03/01/2020 03/31/2020 1.1 Sprint Report Package - April 2020
Sprint Report Package - April 2020
Sprint Report Package - April 2020
04/01/2020 04/30/2020 1.11 Sprint Report Package - May 2020
Sprint Report Package - May 2020
Sprint Report Package - May 2020
05/01/2020 05/31/2020 1.12 Sprint Report Package - June 2020
Sprint Report Package - June 2020
Sprint Report Package - June 2020
06/01/2020 06/30/2020 2 2.1
Technical Specifications Documents
Technical Specifications Documents
06/01/2020 06/30/2020 4.1 4.1
Unit test plan
Unit test plan
06/01/2020 06/30/2020 4.2 4.2
Unit test scripts
Unit test scripts
06/01/2020 06/30/2020 Background Verification
Minimum Verification Requirements
Please have the candidate complete the required form upon selection. The form is located on the dashboard.